NEW PROJECT: First Light - Royal Observatory Greenwich

 

Greenway Associates have been appointed as Cost Consultants x Jared - who is working on project? on First Light, the £77 million transformation of the historic Royal Observatory Greenwich.

With the base-build works now underway, the redevelopment is set to complete in Spring 2028. The Meridian Courtyard is expected to reopen in Summer 2027, ahead of the full Observatory reopening in 2028.

 

An artist's impression of the proposed new visitor spaces at the Royal Observatory Greenwich, including the lift tower alongside the Great Equatorial Telescope.

Image credit: Royal Museums Greenwich

xxxxx will ask Naomi from RMG if we can use these 3 images xxxxx

THE PROJECT

Established in 1675 by King Charles II, the Royal Observatory Greenwich has played an important role in the history of astronomy, navigation and timekeeping. It is home to Greenwich Mean Time (GMT) and the Prime Meridian, and has been a centre for scientific observation for more than 350 years.

The First Light redevelopment will improve visitor facilities while addressing the conservation and repair of the Observatory's historic buildings. Designed by Jamie Fobert Architects, the plans include a new entrance pavilion, step-free routes across the site, a landscaped garden walk and a new lift and staircase providing access to the Great Equatorial Telescope.

The exhibition programme will include four new interactive galleries exploring light, matter and motion, alongside the Astronomers' Court, a covered space for exhibitions, science demonstrations and events. The talented team at Casson Mann is responsible for exhibition design.

Sustainability has been an important consideration throughout the design. The proposals include moving away from gas-fired heating towards air-source heat pumps, alongside measures to reduce energy use and the embodied carbon of new construction. This includes exploring lower-carbon concrete mixes and using structural design to minimise material requirements, while extending the life of the Observatory's existing historic buildings.

An overview of the Royal Observatory Greenwich site, showing the historic buildings, surrounding landscape and proposed changes as part of the First Light redevelopment.

Image credit: Royal Museums Greenwich

 

Artist's impression of the proposed visitor courtyard at the Royal Observatory Greenwich.

Image credit: Royal Museums Greenwich


 

THE LINE UP (xxxxx Jared pls check line up- anyone else you think i should add?)

Client: Royal Museums Greenwich
Cost Consultant: Greenway Associates
Architect: Jamie Fobert Architects
Exhibition Designer: Casson Mann
Engineer: Price & Myers
Exhibition Project Management & Contract Administration: Fraser Randall